Mission's commercial work is small-scale and spread out: a workshop, a kennel, a stable, a property with a house and two outbuildings that each need hot water.
Demand arrives in a burst
The peak hour matters more than the daily total. Several outlets drawing at once, at the temperature the work needs, decides whether the system copes. A large tank paired with a small heat source stores water but cannot replace it fast enough.
Supply before specification
On these parcels, the water source is the first constraint. A well's output, storage and recovery rate cap what can be installed. Where supply is shared or hauled, storage volume and connections that do not weep matter more than a rating plate.
Separate buildings, separate units
A unit per building keeps a failure contained and shortens the pipe run. One heater serving several structures means every draw travels further, loses heat and, in winter, risks freezing.
Wind, dust and venting
An exposed site collects grit in burners and challenges a flue that has to draft in moving air. Both are safety checks, not efficiency tweaks.
Unheated space
Barns and outbuildings freeze. Insulation, trace heating or relocating the appliance are the answers; a heater in a freezing room will keep failing.
Scheduling around the work
The property's tolerance for cold water sets the plan: overnight, before the day starts, or one building at a time.
What can be renewed
Controls, burners, elements, valves and expansion vessels are wear items. A failed shell or exchanger is not, and units of the same age tend to reach the end together.
For a failure in progress see the emergency page; for a new installation, installation.