Installation on a corridor parcel begins with the water, because everything else is chosen around it.
Establishing the supply
A well, a shared arrangement or a delivered supply each behave differently. Pressure that cycles with a pump is normal; grit is not unusual. Both are established before an appliance is specified, and a filter ahead of the heater is fitted where material is arriving.
Fuel
Gas where a main reaches the property, propane where it does not, electric where gas is impractical. A propane unit needs the matching orifice and regulator, and a tank able to feed the draw. An electric unit needs a circuit sized for its elements.
Venting
The flue must suit the appliance and the wall. Wind on an exposed site can defeat a termination that looks fine on a still day, so the route and the wall are considered together, with clearances measured.
Frost
What freezes is water in the pipework and in a tankless exchanger. Lagging, trace heating on long runs and a position that stays above freezing are the measures, and a tankless unit needs all three.
Access
A shoulder turn, a gate, a slope. The unit has to arrive, and the old one has to leave, so the route is part of the plan.
Inspection
The county checks the flue, the clearances, where the relief valve discharges and how the tank is braced.
A swap is covered on the replacement page; on-demand units on the tankless page.